Stucco aluminum cladding across 2,100 linear meters of chilled water supply headers inside a multi-level commercial district cooling station.
Expanding an operating district cooling station in Downtown Dubai required cladding installation within a live, multi-level commercial facility, with minimal disruption to ongoing chilled water supply operations.
The SolutionOur CNC-prefabricated stucco aluminum sections (0.8mm) allowed rapid on-site assembly with 99.8% fit accuracy, keeping the header expansion on schedule without interrupting building cooling supply.
The Result2,100 linear meters of new chilled water header capacity came online with fully clad, energy-efficient piping and zero disruption to the existing cooling station's operations.